Morven Gilchrist is taking the fluid-dynamic know-how behind Brackenlea's AerloHeat patent into PFAS treatment. This map follows Morven from the decision to pursue PFAS to a utility letter of support and an OEM licence, and shows each organisation only at the moment it becomes relevant. It assumes the full range of Scottish business advisory and development finance support.
20 of the 28 relationships on the map run through Morven. Funders, researchers, regulators and utilities rarely talk to each other, so Morven carries the evidence between them.
The technology position is assembled from desk assessment. All eight technical moments are hypotheses with gate criteria and need detailed evaluation before any funder relies on them.
Every grant, investor and utility will judge results on ISO 17025 PFAS data at ng/l. Without that contract, no TRL claim stands.
Ofwat money needs an England or Wales water company to lead. Scottish Water may host a pilot, but it cannot lead an Ofwat entry.
Read the five phase panels left to right, then follow the lines out from Morven. Dashed lines are assumed relationships still to be tested. Moments and chips in burnt orange are technical steps that need detailed evaluation.
These steps come from the PFAS Technical Assessment roadmap. Each one states a hypothesis and a gate. None has been tested, and each needs independent technical evaluation before it appears in a grant claim, an investment memorandum or a utility conversation.
| Moment | Workstream · TRL · months | What detailed evaluation must establish | Gate criterion | Evaluators | Status |
|---|---|---|---|---|---|
| 6 PFAS analytical validation | WS3.1 · enabler · 1–48 | Limits of quantification at ng/l on the DWI 48-PFAS and Scottish 20-PFAS panels; matrix effects in real source water; chain of custody. Indicative £40–80k a year. | LC-MS/MS method validated to ISO 21675 or EPA 537.1/533 in an ISO 17025 lab | Accredited lab (e.g. SOCOTEC, ALS, Eurofins) | Requires evaluation |
| 8 WS1 bench rig and CFD | WS1 Ph 1A · TRL 3→4 · 1–9 | Whether CFD bubble-generation models hold on the rig; representativeness of the synthetic panel (PFOS, PFOA, PFBA, PFBS, GenX); Design-of-Experiments plan. | Removal at least equal to a baseline sparger at the same gas-liquid ratio | University PI (to confirm); lab | Requires evaluation |
| 9 WS2 cavitation bench proof | WS2 Ph 1 · TRL 3→4 · 1–12 | Whether the reactor destroys PFOS rather than separating it; cavitation-number regime; reaction products and short-chain by-products. | Demonstrated PFOS destruction at bench, with reaction-product analysis confirming the route | University partner with a cavitation group (KTH, Cranfield, Sheffield or Leeds) | Requires evaluation |
| 10 WS1 optimisation | WS1 Ph 1B · TRL 4→5 · 7–18 | Chamber geometry; co-surfactant dose-response; bubble size by high-speed imaging; foam stability; pilot unit specification. | ≥20% relative improvement in short-chain PFAS removal against baseline | University partner; lab; patent attorney for the continuation filing | Requires evaluation |
| 14 WS1 utility pilot | WS1 Ph 2 · TRL 5→6 · 16–30 | Performance on real source water with endogenous PFAS over long runs; measurement and verification protocol; fit with existing SAFF systems. | Stable over ≥1,000 hours and an economic case for inline integration | Host utility; lab; independent M&V reviewer | Requires evaluation |
| 15 WS2 mineralisation and energy | WS2 Ph 2 · TRL 4→5 · 12–30 | Mineralisation by fluoride balance and TOP assay; energy per cubic metre; reactor life; short-chain species. | Energy intensity at or below about 5 kWh/m³ and acceptable mineralisation evidence | Cavitation partner; lab | Requires evaluation |
| 16 Materials-in-contact approval | Regulatory · TRL 6→7 · 28–42 | Which components touch potable water; test regime and timescale under DWI Regulation 31 and the DWQR route in Scotland. | Dossier accepted for submission | Regulatory specialist; DWI / DWQR | Requires evaluation |
| 18 Integrated demonstrator | WS1 Ph 3 + WS2 Ph 3 · TRL 6→7 · 28–48 | Coupling concentration (foamate) to destruction at utility scale; integration IP at the process boundary. | Utility partner letter of support for full-scale procurement, subject to terms | Utility partner; OEM; independent reviewer | Requires evaluation |
The Scottish Business Advisory Team (navy) gives account-managed advice across eleven specialisms. The Scottish Development Finance team (copper) runs the SIB and SNIB investment process from route assessment to post-investment. Names are the advisory personas and are illustrative.
Windows change often. Confirm each one with the funder before committing effort.
| Instrument | Scale | Timing | Fit for Brackenlea | Status |
|---|---|---|---|---|
| Scottish Enterprise feasibility fund (SMART:SCOTLAND successor) | ≤ £100k at 60–70% | Launch "late autumn 2026" | Moments 7–9. The SE page also says "summer 2026" in its metadata. Ask the account manager which date is right. | Upcoming |
| Ofwat Water Breakthrough Challenge 7, Catalyst stream | £150k–£2m | Closes 5 Jan 2027 | Moment 11. Needs a licensed England or Wales water company as lead. Forever chemicals are a named challenge. | Open |
| Ofwat Water Breakthrough Challenge 7, Transform stream | £2m–£10m | Stage 1 closed 28 Sep 2026 | Too early for TRL 3. Target a later round once pilot data exists. | Closed |
| Innovate UK UK–Germany Bilateral CR&D, Round 5 | ≤ £2.4m | Closes 1 Dec 2026 | Only with a German SME partner applying under ZIM. A stretch option for WS2. | Open |
| Innovate UK Smart Grants | — | Paused | Watch for a replacement SME open competition. | Paused |
| Scottish Co-investment Fund · Scottish Venture Fund | £100k–£2m | Rolling | Moment 12. Matches accredited angel syndicates. | Verify |
| Scottish National Investment Bank | £1m–£50m | Rolling | Moment 17. Net Zero mission. Realistic only after pilot evidence. | Verify |
| R&D tax relief (merged scheme or ERIS) | Cash or credit | Annual claim | Moment 13. Recycles R&D spend into match funding. | Available |
These organisations appear on The Strategy CaFE's Scottish Entrepreneurial Ecosystem Map, which draws on the Scottish Enterprise 2025–26 guide. The # reference is the entry number on that map. Filter by phase to see who matters when.
These gaps are candidates for a water-sector layer on a future version of the Ecosystem Map.
The notes below come from the map. The figures come from the toolkit's pattern scan and are prompts for discussion, not findings.
Morven runs three clocks at once: grant windows, TRL gates and utility procurement. None of the actors sees all three.
Accredited PFAS analytics is the hinge. Every funder and utility relies on it, yet it has no owner in the plan today.
Ofwat routes need an England or Wales water company to lead. Scotland's own utility cannot lead an entry.
Can Scottish Water host the pilot while an English utility leads the bid, and would the data count for both?
Help Morven align funders by giving them one gated programme plan keyed to the TRL gate criteria in the register above.
Pathway A (foam fractionation) leads for 24 months. Pathway B (cavitation) runs smaller and at earlier TRL.
Test the Scottish Enterprise account manager on the scope and timing of the new feasibility fund.
Confirm the university PI and sign the accredited lab contract.
of links run through Morven: a human-router pattern
moment-to-moment hand-offs have no shared actor or direct link
assumed (dashed) relationships still to validate
anchor actors across three or more phases: the strategy adviser, the Programme Manager, the PFAS lab